The construction workflow of a sewage treatment plant consists of the following steps:
1. Project planning: Determine the scale, site selection and design requirements of the sewage treatment plant.
2. Feasibility study: Conduct site survey, data collection and analysis to evaluate the feasibility of the project.
3. Engineering design: carry out engineering design according to the feasibility study results, including sewage treatment process flow, building design, equipment selection and pipeline layout.
4. Construction preparation: site cleaning, construction organization plan, equipment procurement and other preparatory work.
5. Civil construction: According to the design requirements of the sewage treatment plant civil construction, including foundation engineering, building construction and pipeline installation.
6. Equipment installation and commissioning: According to the design requirements, install various sewage treatment equipment, and carry out commissioning and trial operation to ensure the normal operation of the equipment.
7. Completion acceptance: acceptance of the completed sewage treatment plant to ensure that it meets the design requirements and quality standards.
8. Trial operation: Conduct trial operation to test whether the water quality after treatment meets the design requirements, and evaluate the operation cost.
9. Official operation: After the successful trial operation, the sewage treatment plant will be officially operated, and the water quality and treatment effect will be continuously monitored.