The construction workflow of a sewage treatment plant consists of the following steps:


1. Project planning: Determine the scale, site selection and design requirements of the sewage treatment plant.

2. Feasibility study: Conduct site survey, data collection and analysis to evaluate the feasibility of the project.

3. Engineering design: carry out engineering design according to the feasibility study results, including sewage treatment process flow, building design, equipment selection and pipeline layout.

4. Construction preparation: site cleaning, construction organization plan, equipment procurement and other preparatory work.

5. Civil construction: According to the design requirements of the sewage treatment plant civil construction, including foundation engineering, building construction and pipeline installation.

6. Equipment installation and commissioning: According to the design requirements, install various sewage treatment equipment, and carry out commissioning and trial operation to ensure the normal operation of the equipment.

7. Completion acceptance: acceptance of the completed sewage treatment plant to ensure that it meets the design requirements and quality standards.

8. Trial operation: Conduct trial operation to test whether the water quality after treatment meets the design requirements, and evaluate the operation cost.
9. Official operation: After the successful trial operation, the sewage treatment plant will be officially operated, and the water quality and treatment effect will be continuously monitored.